DETAIL DESIGN OF T3’’ TRANSPORTATION TUNNEL
Narrative Description of Project:
T37 Tunnel has been designed in the right bank of the
dam for transportation of the machinery.
Intake portal of T37 tunnel starts at bridge #2,
crosses by DT1 and DT2 tunnels and ends at bridge
#3. T3’ tunnel is in the south of T37 and P11 tunnel is
also loca ted in the east, although there is an access
between P11 and T3′ tunnels, named P38 tunnel, T37’
should be another access tunnel to have more
frequent and efficient transportations.