DETAIL DESIGN OF T37’’ TRANSPORTATION TUNNEL
NARRATIVE DESCRIPTION OF PROJECT:
T37 tunnel has been designed in the right bank of the dam for transportation
of the machinery .
Intake portal of T37 tunnel starts at bridge #2, crosses by DT1 and DT2 tunnels
and ends at bridge #3. T3’ tunnel is in the south of T37 and P11 tunnel is also
locat ed in the east , although the re is an acces s between P11 and T3′ tunnel s ,
named P38 tunnel , T37’ should be another access tunnel to have more
frequent and efficient transportations .