№70, Mirshekar St., M.Tursunzada Ave., Dushanbe, Tajikistan.

DRAINAGE GALLERY AROUND MLDT GATE CHAMBER DESIGN

DRAINAGE GALLERY AROUND MLDT GATE CHAMBER DESIGN

NARRATIVE DESCRIPTION OF PROJECT:
The following document sets out and defines the works undertaken,
analyses made and / or recommendations and conclusi ons drawn for the
rock mechanic, structural design of permanent lining for the drainage
galleries (MLDT=DT4) under normal and earthquake conditions .
Deformation is used base analysis method on MCE level maximum
earthquake

Search

Popular Posts

  • TRANSPORTATION TUNNEL TO UPSTREAM GATE CHAMBER (MTT1) DESIGN
    TRANSPORTATION TUNNEL TO UPSTREAM GATE CHAMBER (MTT1) DESIGN

    For access and transfer of gate and equipment from downstream to the upstream caverns of gate chamber need to excavate a transportation tunnel for MLDT. The tunnel named MTT (middle level diversion transportation tunnel) and will be connected to the ACT1 tunnel. MTT tunnel invert will be located a canal for draining of water to…

  • TRANSPORTATION TUNNEL TO UPSTREAM GATE CHAMBER (MTT) DESIGN
    TRANSPORTATION TUNNEL TO UPSTREAM GATE CHAMBER (MTT) DESIGN

    TRANSPORTATION TUNNEL TO UPSTREAM GATE CHAMBER (MTT) DESIGN NARRATIVE DESCRIPTION OF PROJECT

  • Detail Design of Load Cell Cavern in Transportation Tunnel (T37)
    Detail Design of Load Cell Cavern in Transportation Tunnel (T37)

    DETAIL DESIGN OF LOAD CELL CAVERN IN TRANSPORTATION TUNNEL (T37) NARRATIVE DESCRIPTION OF PROJECT: As a matter of fact, DT1 and DT2 have been designed in Rogun Dam and HPP as diversiontunnels of the Vakhsh River.Intake portals of the mentioned t unnels are located at the left bank (first part) and their outlet portals at…