DETAIL DESIGN OF CABLE TUNNEL SHAFT TO TAKE OFF YARD

DETAIL DESIGN OF CABLE TUNNEL SHAFT TO TAKE OFF YARD

 

NARRATIVE DESCRIPTION OF PROJECT:
The Structures are located on the left bank of the Vakhsh River and on the right bank
of Obi Shur. Studies ar ea are after cable gallery from powerhouse and, will be a
connection parts from GIS switchyard to take off yard

Leave a Reply

Your email address will not be published. Required fields are marked *

Search

Popular Posts

  • TRANSPORTATION TUNNEL TO UPSTREAM GATE CHAMBER (MTT1) DESIGN
    TRANSPORTATION TUNNEL TO UPSTREAM GATE CHAMBER (MTT1) DESIGN

    For access and transfer of gate and equipment from downstream to the upstream caverns of gate chamber need to excavate a transportation tunnel for MLDT. The tunnel named MTT (middle level diversion transportation tunnel) and will be connected to the ACT1 tunnel. MTT tunnel invert will be located a canal for draining of water to…

  • TRANSPORTATION TUNNEL TO UPSTREAM GATE CHAMBER (MTT) DESIGN
    TRANSPORTATION TUNNEL TO UPSTREAM GATE CHAMBER (MTT) DESIGN

    TRANSPORTATION TUNNEL TO UPSTREAM GATE CHAMBER (MTT) DESIGN NARRATIVE DESCRIPTION OF PROJECT

  • Detail Design of Load Cell Cavern in Transportation Tunnel (T37)
    Detail Design of Load Cell Cavern in Transportation Tunnel (T37)

    DETAIL DESIGN OF LOAD CELL CAVERN IN TRANSPORTATION TUNNEL (T37) NARRATIVE DESCRIPTION OF PROJECT: As a matter of fact, DT1 and DT2 have been designed in Rogun Dam and HPP as diversiontunnels of the Vakhsh River.Intake portals of the mentioned t unnels are located at the left bank (first part) and their outlet portals at…