TRANSPORTATION TUNNEL TO UPSTREAM GATE CHAMBER (MTT1) DESIGN
Read More: TRANSPORTATION TUNNEL TO UPSTREAM GATE CHAMBER (MTT1) DESIGNFor access and transfer of gate and equipment from downstream to the upstream caverns of gate chamber need to excavate a transportation tunnel for MLDT. The tunnel named MTT (middle level diversion transportation tunnel) and will be connected to the ACT1 tunnel. MTT tunnel invert will be located a canal for draining of water to…
-
TRANSPORTATION TUNNEL TO UPSTREAM GATE CHAMBER (MTT) DESIGN
Read More: TRANSPORTATION TUNNEL TO UPSTREAM GATE CHAMBER (MTT) DESIGNTRANSPORTATION TUNNEL TO UPSTREAM GATE CHAMBER (MTT) DESIGN NARRATIVE DESCRIPTION OF PROJECT
-
Detail Design of Load Cell Cavern in Transportation Tunnel (T37)
Read More: Detail Design of Load Cell Cavern in Transportation Tunnel (T37)DETAIL DESIGN OF LOAD CELL CAVERN IN TRANSPORTATION TUNNEL (T37) NARRATIVE DESCRIPTION OF PROJECT: As a matter of fact, DT1 and DT2 have been designed in Rogun Dam and HPP as diversiontunnels of the Vakhsh River.Intake portals of the mentioned t unnels are located at the left bank (first part) and their outlet portals at…
-
DETAIL DESIGN OF VENTILATION HALL AND RELATED RETAINING WALL
Read More: DETAIL DESIGN OF VENTILATION HALL AND RELATED RETAINING WALLDETAIL DESIGN OF VENTILATION HALL AND RELATED RETAINING WALL NARRATIVE DESCRIPTION OF PROJECT:Cable Ventilation Hall is a building for decreasing heat of cables coming from powerhouse also doing necessary oper ation and repair on the Galleries.The building is 1 floor structure with concrete frame located on top of cable tunnel coming from powerhouse.There are some…
-
DRAINAGE GALLERY AROUND MLDT GATE CHAMBER DESIGN
Read More: DRAINAGE GALLERY AROUND MLDT GATE CHAMBER DESIGNDRAINAGE GALLERY AROUND MLDT GATE CHAMBER DESIGN NARRATIVE DESCRIPTION OF PROJECT:The following document sets out and defines the works undertaken,analyses made and / or recommendations and conclusi ons drawn for therock mechanic, structural design of permanent lining for the drainagegalleries (MLDT=DT4) under normal and earthquake conditions .Deformation is used base analysis method on MCE level…
-
DETAIL DESIGN OF CABLE TUNNEL SHAFT TO TAKE OFF YARD
Read More: DETAIL DESIGN OF CABLE TUNNEL SHAFT TO TAKE OFF YARDDETAIL DESIGN OF CABLE TUNNEL SHAFT TO TAKE OFF YARD NARRATIVE DESCRIPTION OF PROJECT: The Structures are located on the left bank of the Vakhsh River and on the right bank of Obi Shur. Studies ar ea are after cable gallery from powerhouse and, will be a connection parts from GIS switchyard to take…
-
DETAIL DESIGN OF T37’’ TRANSPORTATION TUNNEL
Read More: DETAIL DESIGN OF T37’’ TRANSPORTATION TUNNELDETAIL DESIGN OF T37’’ TRANSPORTATION TUNNEL
-
DETAIL DESIGN OF T3’’ TRANSPORTATION TUNNEL
Read More: DETAIL DESIGN OF T3’’ TRANSPORTATION TUNNELDETAIL DESIGN OF T3’’ TRANSPORTATION TUNNEL Narrative Description of Project: T37 Tunnel has been designed in the right bank of the dam for transportation of the machinery. Intake portal of T37 tunnel starts at bridge #2, crosses by DT1 and DT2 tunnels and ends at bridge #3. T3’ tunnel is in the south of T37…
-
STABILITY ANALYSES OF POWERHOUSE & TRANSFORMER CAVERNS
Read More: STABILITY ANALYSES OF POWERHOUSE & TRANSFORMER CAVERNSSTABILITY ANALYSES OF POWERHOUSE & TRANSFORMER CAVERNS NARRATIVE DESCRIPTION OF PROJECT This study is intended to assess the stability condition of the underground caverns of Rogun H.P.P project including machine hall (MH) and transformer hall (TH) based on recommendations supported by employer.
-
STABILITY ANALYSES & CIVIL DESIGN OF SEISMOLOGY GALLERIES (MEYDAN BALA & OBI GARM)
Read More: STABILITY ANALYSES & CIVIL DESIGN OF SEISMOLOGY GALLERIES (MEYDAN BALA & OBI GARM)
Search
Popular Posts
-
TRANSPORTATION TUNNEL TO UPSTREAM GATE CHAMBER (MTT1) DESIGN
For access and transfer of gate and equipment from downstream to the upstream caverns of gate chamber need to excavate a transportation tunnel for MLDT. The tunnel named MTT (middle level diversion transportation tunnel) and will be connected to the ACT1 tunnel. MTT tunnel invert will be located a canal for draining of water to…
-
TRANSPORTATION TUNNEL TO UPSTREAM GATE CHAMBER (MTT) DESIGN
TRANSPORTATION TUNNEL TO UPSTREAM GATE CHAMBER (MTT) DESIGN NARRATIVE DESCRIPTION OF PROJECT
-
Detail Design of Load Cell Cavern in Transportation Tunnel (T37)
DETAIL DESIGN OF LOAD CELL CAVERN IN TRANSPORTATION TUNNEL (T37) NARRATIVE DESCRIPTION OF PROJECT: As a matter of fact, DT1 and DT2 have been designed in Rogun Dam and HPP as diversiontunnels of the Vakhsh River.Intake portals of the mentioned t unnels are located at the left bank (first part) and their outlet portals at…
Categories
Archives
Tags
Cavern (1) Dam (12) dam & hpp (1) design (1) detail design (6) Diversion Tunnel (4) Drainage Gallery (2) HPP (8) hydromechanic (2) hydropower (1) powerhouse (1) project management (1) projects (1) rodun dam (1) rogun dam (9) stability analysis (3) tajik kan company (1) transportation tunnel (4) Tunnel (11)