Tag: project management
-
Detail Design of Load Cell Cavern in Transportation Tunnel (T37)
Read More: Detail Design of Load Cell Cavern in Transportation Tunnel (T37)Detail Design of Load Cell Cavern in Transportation Tunnel (T37) NARRATIVE DESCRIPTION OF PROJECT: As a matter of fact, DT1 and DT2 have been designed in Rogun Dam and HPP as diversion tunnels of the Vakhsh River. Intake portals of the mentioned t unnels are located at the left bank (first part) and their outlet…
-
DETAIL DESIGN OF MID-LEVEL DIVERSION TUNNEL (DT4) (CH. 0 TO 600M)
Read More: DETAIL DESIGN OF MID-LEVEL DIVERSION TUNNEL (DT4) (CH. 0 TO 600M)DETAIL DESIGN OF MID-LEVEL DIVERSION TUNNEL (DT4) (CH. 0 TO 600M) Narrative Description of Project: The Middle Level Diversion Tunnel (MLDT=DT4) Is required for protecting the dam during Its construction starting from water elevation 1100 m.a s l This same elevation is considered as The Limit of Normal operation of the DT1 and DT2, being…
Search
Popular Posts
-
TRANSPORTATION TUNNEL TO UPSTREAM GATE CHAMBER (MTT1) DESIGN
For access and transfer of gate and equipment from downstream to the upstream caverns of gate chamber need to excavate a transportation tunnel for MLDT. The tunnel named MTT (middle level diversion transportation tunnel) and will be connected to the ACT1 tunnel. MTT tunnel invert will be located a canal for draining of water to…
-
TRANSPORTATION TUNNEL TO UPSTREAM GATE CHAMBER (MTT) DESIGN
TRANSPORTATION TUNNEL TO UPSTREAM GATE CHAMBER (MTT) DESIGN NARRATIVE DESCRIPTION OF PROJECT
-
Detail Design of Load Cell Cavern in Transportation Tunnel (T37)
DETAIL DESIGN OF LOAD CELL CAVERN IN TRANSPORTATION TUNNEL (T37) NARRATIVE DESCRIPTION OF PROJECT: As a matter of fact, DT1 and DT2 have been designed in Rogun Dam and HPP as diversiontunnels of the Vakhsh River.Intake portals of the mentioned t unnels are located at the left bank (first part) and their outlet portals at…
Categories
Archives
Tags
Cavern (1) Dam (12) dam & hpp (1) design (1) detail design (6) Diversion Tunnel (4) Drainage Gallery (2) HPP (8) hydromechanic (2) hydropower (1) powerhouse (1) project management (1) projects (1) rodun dam (1) rogun dam (9) stability analysis (3) tajik kan company (1) transportation tunnel (4) Tunnel (11)